Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
548
matching recommendationsNAICS | 33361 | Engine, Turbine, and Power Transmission Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0190 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,450 | $2,500 | Not Implemented |
LE0190 # 04 Y:2004 | 04 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,412 | $750 | Not Implemented |
LE0190 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,074 | $218 | Implemented |
LE0190 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,187 | $33,512 | Implemented |
UM0248 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $18,156 | $2,400 | Not Implemented |
UM0248 # 02 Y:2004 | 02 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,467 | $2,000 | Implemented |
UM0248 # 03 Y:2004 | 03 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,420 | $920 | Not Implemented |
UM0248 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $225 | Implemented |
UM0248 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,550 | $1,000 | Not Implemented |
BD0254 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,778 | $6,000 | Implemented |
BD0254 # 02 Y:2004 | 02 | 2004 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $6,110 | $38,400 | Not Implemented |
BD0254 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,567 | $521 | Implemented |
BD0254 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,675 | $700 | Implemented |
BD0254 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,728 | $2,885 | Not Implemented |
BD0254 # 06 Y:2004 | 06 | 2004 | USE SYNTHETIC LUBRICANT | $2,104 | $700 | Implemented |
BD0254 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,257 | $1,000 | Implemented |
BD0254 # 08 Y:2004 | 08 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $3,500 | Implemented |
BD0254 # 09 Y:2004 | 09 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $826 | $1,514 | Not Implemented |
BD0254 # 10 Y:2004 | 10 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $766 | $0 | Implemented |
BD0254 # 11 Y:2004 | 11 | 2004 | INSTALL OCCUPANCY SENSORS | $681 | $1,350 | Not Implemented |
BD0254 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $589 | $1,023 | Not Implemented |
BD0254 # 13 Y:2004 | 13 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,580 | $240 | Implemented |
BD0254 # 14 Y:2004 | 14 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,800 | $2,000 | Not Implemented |
LM0070 # 01 Y:2004 | 01 | 2004 | DISCONNECT BALLASTS | $4,442 | $0 | Implemented |
LM0070 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $1,970 | $110 | Implemented |