IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0348 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $651 $146 Implemented
IA0348 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $120 Not Implemented
IA0348 # 02 Y:2004 02 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,336 $475 Not Implemented
IA0348 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $535 Implemented
OR0470 # 01 Y:2004 01 2004 $92,000 $1,200 Not Implemented
OR0470 # 03 Y:2004 03 2004 ELIMINATE/REDUCE AN OPERATION $9,627 $250 Not Implemented
OR0470 # 05 Y:2004 05 2004 ELIMINATE/REDUCE AN OPERATION $1,185 $165 Implemented
OR0470 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,990 $300 Not Implemented
OR0470 # 02 Y:2004 02 2004 $11,400 $2,800 Not Implemented
CO0553 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,980 $180 Implemented
CO0553 # 01 Y:2004 01 2004 UPGRADE CONTROLS ON COMPRESSORS $5,190 $20,000 Not Implemented
CO0553 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,260 $3,020 Not Implemented
CO0553 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,260 $8,700 Not Implemented
CO0553 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,930 $20,520 Not Implemented
CO0553 # 06 Y:2004 06 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,620 $15,230 Not Implemented
CO0553 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $360 $520 Not Implemented
WI0477 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,524 $855 Not Implemented
WI0477 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,743 $0 Not Implemented
WI0477 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,765 $605 Not Implemented
WI0477 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,817 $433 Not Implemented
WI0477 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $923 $0 Not Implemented
WI0477 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $0 Implemented
WI0477 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $0 Not Implemented
UM0262 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,293 $1,410 Not Implemented
UM0262 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $500 Not Implemented