Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,619
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0802 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,610 | $6,510 | Implemented |
GT0802 # 05 Y:2005 | 05 | 2005 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,820 | $60 | Not Implemented |
GT0802 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,100 | $0 | Implemented |
GT0802 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,780 | $5,000 | Implemented |
UD0716 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $72,768 | $0 | Not Implemented |
UD0716 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,047 | $65,800 | Implemented |
UD0716 # 03 Y:2005 | 03 | 2005 | REVISE SMOKE CLEANUP FROM OPERATIONS | $38,756 | $150,000 | Not Implemented |
UD0716 # 04 Y:2005 | 04 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,151 | $3,200 | Not Implemented |
UD0716 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,088 | $0 | Not Implemented |
UD0716 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,922 | $1,440 | Implemented |
UD0716 # 07 Y:2005 | 07 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $2,750 | $0 | Not Implemented |
UD0716 # 08 Y:2005 | 08 | 2005 | COVER OPEN TANKS | $2,599 | $0 | Not Implemented |
UD0716 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $507 | $0 | Not Implemented |
TA0092 # 01 Y:2005 | 01 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,280 | $2,300 | Not Implemented |
TA0092 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,280 | $1,300 | Implemented |
TA0092 # 03 Y:2005 | 03 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $3,580 | $5 | Implemented |
TA0092 # 04 Y:2005 | 04 | 2005 | REDUCE OR ELIMINATE WASTE | $2,710 | $36 | Implemented |
TA0092 # 05 Y:2005 | 05 | 2005 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,200 | $111 | Not Implemented |
TA0092 # 06 Y:2005 | 06 | 2005 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $1,140 | $0 | Implemented |
TA0092 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $535 | $155 | Not Implemented |
TA0092 # 08 Y:2005 | 08 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $250 | $0 | Not Implemented |
BD0283 # 01 Y:2005 | 01 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,694 | $3,003 | Implemented |
BD0283 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,780 | $602 | Not Implemented |
BD0283 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,828 | $2 | Implemented |
BD0283 # 04 Y:2005 | 04 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $2,160 | $361 | Not Implemented |