IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0437 # 04 Y:2024 04 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $288,884 $300,000 n/a
MS0437 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $147 $0 n/a
MS0437 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $34,017 $458,990 n/a
MS0437 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $272 $2,237 n/a
MS0436 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,430 $50,000 n/a
MS0436 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $52,267 $553,175 n/a
MS0436 # 01 Y:2024 01 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,420 $255 n/a
MS0436 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $822 $15,226 n/a
MS0425 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,601 $8,975 n/a
MS0425 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,979 $25,000 n/a
MS0425 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,008 $1,523 n/a
MS0425 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,356 $0 n/a
MS0425 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,396 $255 n/a
MS0425 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $64,575 $710,500 n/a
UA0079 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $106 Implemented
UA0079 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,119 $480 Implemented
UA0079 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,031 $6,195 Not Implemented
UA0079 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,836 $1,500 Not Implemented
UA0079 # 01 Y:2012 01 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $57,749 $240,000 Not Implemented
MS0253 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,649 $4,689 Not Implemented
MS0253 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $1,526 $4,000 Implemented
MS0253 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $288 Implemented
MS0253 # 05 Y:2004 05 2004 BURN WASTE OIL FOR HEAT $703 $2,190 Not Implemented
MS0253 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $480 $708 Not Implemented
MS0253 # 07 Y:2004 07 2004 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $336 $68 Not Implemented