Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0437 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $147 | $0 | n/a |
MS0437 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $288,884 | $300,000 | n/a |
MS0437 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,017 | $458,990 | n/a |
MS0437 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $272 | $2,237 | n/a |
MS0436 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,420 | $255 | n/a |
MS0436 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $822 | $15,226 | n/a |
MS0436 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,430 | $50,000 | n/a |
MS0436 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,267 | $553,175 | n/a |
MS0425 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $64,575 | $710,500 | n/a |
MS0425 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,396 | $255 | n/a |
MS0425 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,356 | $0 | n/a |
MS0425 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,008 | $1,523 | n/a |
MS0425 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,601 | $8,975 | n/a |
MS0425 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,979 | $25,000 | n/a |
UA0079 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,031 | $6,195 | Not Implemented |
UA0079 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $112 | $106 | Implemented |
UA0079 # 01 Y:2012 | 01 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $57,749 | $240,000 | Not Implemented |
UA0079 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,836 | $1,500 | Not Implemented |
UA0079 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,119 | $480 | Implemented |
MS0253 # 06 Y:2004 | 06 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $480 | $708 | Not Implemented |
MS0253 # 07 Y:2004 | 07 | 2004 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $336 | $68 | Not Implemented |
MS0253 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $198 | $735 | Implemented |
MS0253 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $853 | $288 | Implemented |
MS0253 # 03 Y:2004 | 03 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $1,526 | $4,000 | Implemented |
MS0253 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,649 | $4,689 | Not Implemented |