IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 3339 Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0394 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $2,219 Not Implemented
UF0394 # 07 Y:2006 07 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,995 $1,250 Not Implemented
UF0394 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,473 $24,457 Not Implemented
UF0394 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,956 $0 Implemented
UF0394 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,147 $33,136 Not Implemented
UF0394 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,287 $810 Implemented
UF0394 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $145,983 $20,000 Not Implemented
UF0394 # 10 Y:2006 10 2006 INSTALL BACK-UP EQUIPMENT $341,046 $100,000 Not Implemented
UF0394 # 09 Y:2006 09 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,183 $24,800 Not Implemented
UF0394 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $1,756 $1,706 Implemented
UD0752 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,542 $0 Implemented
UD0752 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,798 $225 Implemented
UD0752 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,473 $40,463 Implemented
UD0752 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,557 $0 Implemented
UD0752 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,592 $0 Implemented
UU0104 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $3,510 $8,490 Not Implemented
UU0104 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,540 $3,530 Not Implemented
UU0104 # 04 Y:2006 04 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $104,490 $16,800 Not Implemented
UU0104 # 05 Y:2006 05 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $198,120 $1,974,210 Not Implemented
UU0104 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,650 $28,400 Not Implemented
UU0104 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $2,420 $2,000 Not Implemented
UU0104 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,040 $10,000 Not Implemented
MS0298 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,377 $17,617 Implemented
MS0298 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,739 $1,313 Implemented
MS0298 # 03 Y:2006 03 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,854 $1,700 Not Implemented