IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0229 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $10,455 $14,400 Not Implemented
UA0229 # 05 Y:2020 05 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,688 $11,100 Not Implemented
UA0229 # 04 Y:2020 04 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $78,540 $5,000 Not Implemented
UA0229 # 03 Y:2020 03 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $27,038 $15,000 Not Implemented
UA0229 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,562 $6,700 Implemented
UA0229 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,905 $2,000 Implemented
UA0087 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,463 $2,000 Implemented
UA0087 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,153 $960 Not Implemented
UA0087 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,843 Not Implemented
UA0087 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $10,082 $1,700 Implemented
UA0087 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,599 $3,290 Not Implemented
UA0087 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $1,875 Not Implemented
UA0087 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $2,185 $217 Not Implemented
UA0054 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $2,443 $1,893 Not Implemented
UA0054 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $4,372 $3,230 Implemented
UA0054 # 06 Y:2010 06 2010 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $25,338 $6,850 Not Implemented
UA0054 # 05 Y:2010 05 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,638 $40,400 Not Implemented
UA0054 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,265 $71,625 Not Implemented
UA0054 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,010 $7,000 Implemented
UA0054 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,442 $1,000 Not Implemented
MS0298 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,600 $53,730 Implemented
MS0298 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,739 $1,313 Implemented
MS0298 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,852 $2,775 Implemented
MS0298 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,964 $236 Implemented
MS0298 # 03 Y:2006 03 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,854 $1,700 Not Implemented