Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 33392 | Material Handling Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0394 # 10 Y:2006 | 10 | 2006 | INSTALL BACK-UP EQUIPMENT | $341,046 | $100,000 | Not Implemented |
UF0394 # 09 Y:2006 | 09 | 2006 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,183 | $24,800 | Not Implemented |
UF0394 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,450 | $2,219 | Not Implemented |
UF0394 # 07 Y:2006 | 07 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $12,995 | $1,250 | Not Implemented |
UF0394 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,473 | $24,457 | Not Implemented |
UF0394 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $1,756 | $1,706 | Implemented |
UF0394 # 02 Y:2006 | 02 | 2006 | OPTIMIZE PLANT POWER FACTOR | $145,983 | $20,000 | Not Implemented |
UF0394 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,287 | $810 | Implemented |
UF0394 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,147 | $33,136 | Not Implemented |
UF0394 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,956 | $0 | Implemented |
UU0104 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $2,420 | $2,000 | Not Implemented |
UU0104 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,650 | $28,400 | Not Implemented |
UU0104 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $19,040 | $10,000 | Not Implemented |
UU0104 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,540 | $3,530 | Not Implemented |
UU0104 # 04 Y:2006 | 04 | 2006 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $104,490 | $16,800 | Not Implemented |
UU0104 # 05 Y:2006 | 05 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $198,120 | $1,974,210 | Not Implemented |
UU0104 # 07 Y:2006 | 07 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,510 | $8,490 | Not Implemented |
MS0298 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,600 | $53,730 | Implemented |
MS0298 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,377 | $17,617 | Implemented |
MS0298 # 03 Y:2006 | 03 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,854 | $1,700 | Not Implemented |
MS0298 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,964 | $236 | Implemented |
MS0298 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,852 | $2,775 | Implemented |
MS0298 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,739 | $1,313 | Implemented |
IA0388 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,922 | $52 | Implemented |
IA0388 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,869 | $480 | Implemented |