IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
NAICS 333922 Conveyor and Conveying Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0843 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $18,385 $33,511 Not Implemented
AS0502 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,685 $2,400 Not Implemented
AS0502 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $168 $375 Implemented
AS0502 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $350 $1,131 Not Implemented
AS0502 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $1,127 Implemented
AS0502 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $359 $793 Implemented
AS0502 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,647 $200 Not Implemented
AS0502 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $672 $284 Not Implemented
AS0502 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,703 $13,532 Implemented
OK1034 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $8,582 $18,054 Not Implemented
OK1034 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $2,340 Not Implemented
OK1034 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,909 $49,013 Implemented
OK1034 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $459 $320 Implemented
OK1034 # 06 Y:2020 06 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,799 $0 Implemented
OK1034 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $536 $713 Not Implemented
OK1034 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,763 $4,560 Implemented
OK1018 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,409 $4,914 Not Implemented
OK1018 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,422 $870 Not Implemented
OK1018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,691 $60,951 Not Implemented
OK1018 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $547 $0 Not Implemented
OK1018 # 07 Y:2019 07 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $507 $219 Not Implemented
OK1018 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $44,286 $21,990 Not Implemented
OK1018 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,577 $0 Not Implemented
OK1018 # 08 Y:2019 08 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,546 $0 Not Implemented
WV0575 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $510 $1,400 Not Implemented