IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
NAICS 33399 All Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0716 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $507 $0 Not Implemented
SF0299 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,880 $720 Not Implemented
SF0299 # 02 Y:2005 02 2005 USE PHOTOCELL CONTROLS $2,789 $840 Not Implemented
SF0299 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,353 $2,547 Not Implemented
SF0299 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,135 $1,948 Not Implemented
SF0299 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $880 Not Implemented
SF0299 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,229 $3,057 Not Implemented
SF0299 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,571 $74,180 Not Implemented
SF0299 # 08 Y:2005 08 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,408 $8,000 Not Implemented
IA0348 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,818 $10,704 Implemented
IA0348 # 02 Y:2004 02 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,336 $475 Not Implemented
IA0348 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $651 $146 Implemented
IA0348 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $535 Implemented
IA0348 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $14,216 Implemented
IA0348 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $193 $438 Not Implemented
IA0348 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $120 Not Implemented
IA0348 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,653 $4,596 Implemented
OR0470 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $92,000 $1,200 Not Implemented
OR0470 # 02 Y:2004 02 2004 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $11,400 $2,800 Not Implemented
OR0470 # 03 Y:2004 03 2004 ELIMINATE/REDUCE AN OPERATION $9,627 $250 Not Implemented
OR0470 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,990 $300 Not Implemented
OR0470 # 05 Y:2004 05 2004 ELIMINATE/REDUCE AN OPERATION $1,185 $165 Implemented
UM0262 # 01 Y:2004 01 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,974 $1,200 Not Implemented
UM0262 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $300 Not Implemented
UM0262 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,293 $1,410 Not Implemented