IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 33399 All Other General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0249 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,261 $8,080 Implemented
UA0249 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,213 $100 Not Implemented
UA0249 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $320 $20 Implemented
UA0249 # 02 Y:2021 02 2021 USE RADIANT HEATER FOR SPOT HEATING $15,788 $20,165 Not Implemented
UA0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,396 $17,269 Implemented
UA0091 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $132 $210 Not Implemented
UA0091 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,368 $546 Implemented
UA0091 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $1,300 Implemented
UA0091 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $1,600 Not Implemented
UA0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,459 $24,444 Not Implemented
UA0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $668 $1,241 Implemented
UA0065 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,025 $800 Not Implemented
UA0065 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $702 $1,100 Implemented
UA0065 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $832 $1,935 Not Implemented
UA0065 # 06 Y:2011 06 2011 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $510 $1,533 Not Implemented
UA0020 # 09 Y:2008 09 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,611 $7,000 Implemented
UA0020 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $481 $2,100 Not Implemented
UA0020 # 07 Y:2008 07 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94 $327 Not Implemented
UA0020 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,259 $60,237 Implemented
UA0020 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $202 $700 Implemented
UA0020 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $0 Implemented
UA0020 # 04 Y:2008 04 2008 INSTALL TIMERS AND/OR THERMOSTATS $90 $236 Not Implemented
UA0020 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $7,553 $13,800 Implemented
UA0020 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $15,096 Implemented