IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
NAICS 333999 All Other Miscellaneous General Purpose Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0456 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,040 $2,069 Implemented
WV0456 # 11 Y:2012 11 2012 IMPROVE LUBRICATION PRACTICES $1,660 $1,000 Implemented
WV0456 # 12 Y:2012 12 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,637 $2,475 Implemented
WV0456 # 13 Y:2012 13 2012 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,180 $1,000 Implemented
WV0456 # 14 Y:2012 14 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,129 $555 Implemented
WV0456 # 15 Y:2012 15 2012 DEVELOP A REPAIR/REPLACE POLICY $1,089 $981 Implemented
WV0456 # 16 Y:2012 16 2012 USE PHOTOCELL CONTROLS $824 $705 Implemented
UA0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $668 $1,241 Implemented
UA0065 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $702 $1,100 Implemented
WV0414 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,304 $42,420 Implemented
WV0414 # 03 Y:2010 03 2010 REDUCE FLUID FLOW RATES $7,185 $280 Implemented
WV0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $3,614 Implemented
WV0414 # 10 Y:2010 10 2010 RECOVER MECHANICAL ENERGY $1,362 $1,000 Implemented
WV0414 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,335 $1,070 Implemented
WV0414 # 12 Y:2010 12 2010 DEVELOP A REPAIR/REPLACE POLICY $1,318 $740 Implemented
WV0414 # 14 Y:2010 14 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $388 $1,735 Implemented
UD0793 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $25,000 Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented
UD0793 # 04 Y:2009 04 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,855 $0 Implemented
UD0793 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,114 $0 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented
UD0793 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,000 Implemented
TT0025 # 01 Y:2008 01 2008 $16,982 $1,525 Implemented