IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0417 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,598 $46,276 Not Implemented
IA0417 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,956 $13,071 Not Implemented
IA0417 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,650 $1,078 Not Implemented
IA0417 # 04 Y:2007 04 2007 ADD AREA LIGHTING SWITCHES $7,664 $1,875 Not Implemented
IA0417 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,033 $3,978 Not Implemented
IA0417 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,044 $2,000 Not Implemented
LL0285 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $319 Implemented
LL0285 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $291 $330 Implemented
LL0285 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $252 Implemented
LL0285 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $145 $1,734 Not Implemented
LL0285 # 02 Y:2007 02 2007 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,914 $1,160 Implemented
LL0285 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $1,056 $900 Not Implemented
LL0285 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $99 $81 Not Implemented
LL0285 # 01 Y:2007 01 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,109 $60 Implemented
IA0408 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $3,284 $1,309 Not Implemented
IA0408 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,366 $16,698 Implemented
IA0408 # 03 Y:2007 03 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $215 $25 Not Implemented
IA0408 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $491 $700 Not Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 05 Y:2007 05 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,471 $800 Not Implemented
LE0254 # 07 Y:2007 07 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,029 $800 Not Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
LE0254 # 01 Y:2007 01 2007 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $81,900 $65,000 Not Implemented
LE0254 # 02 Y:2007 02 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $67,570 $67,000 Not Implemented
LE0254 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,157 $20,000 Not Implemented