IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0285 # 02 Y:2007 02 2007 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,914 $1,160 Implemented
LL0285 # 01 Y:2007 01 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,109 $60 Implemented
LL0285 # 07 Y:2007 07 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $319 Implemented
LL0285 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $252 Implemented
LL0285 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $291 $330 Implemented
IA0408 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,366 $16,698 Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented
MI0145 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $26,104 $915 Implemented
MI0145 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,164 $45,864 Implemented
MI0145 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $142 $225 Implemented
MI0145 # 05 Y:2007 05 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,120 $1,175 Implemented
LL0270 # 06 Y:2007 06 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $129 $36 Implemented
LL0270 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $240 Implemented
LL0270 # 02 Y:2007 02 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,408 $240 Implemented
LL0270 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $70 Implemented
SU0261 # 01 Y:2007 01 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,451 $0 Implemented
SU0261 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $403 $0 Implemented
SU0261 # 03 Y:2007 03 2007 USE SYNTHETIC LUBRICANT $138 $0 Implemented
SU0261 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $1,114 Implemented
SU0261 # 08 Y:2007 08 2007 REDUCE VENTILATION AIR $12,057 $13,919 Implemented
SU0261 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $7,860 Implemented
SU0261 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $5,887 Implemented
SU0261 # 13 Y:2007 13 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,169 $135,500 Implemented
SU0261 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $249 Implemented