IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 33411 Computer and Peripheral Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0393 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,381 $775 Implemented
SU0393 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $3,091 $1,521 Implemented
SU0393 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $458 $394 Implemented
SU0393 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,698 $45,865 Implemented
SU0393 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $478 $926 Implemented
SU0393 # 07 Y:2015 07 2015 ELIMINATE/REDUCE AN OPERATION $2,246 $4,783 Not Implemented
SU0393 # 08 Y:2015 08 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $207 $488 Implemented
BS0047 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $536 $15 Implemented
BS0047 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $32,541 Not Implemented
BS0047 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,021 $495 Not Implemented
BS0047 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,278 $200 Not Implemented
BS0047 # 05 Y:2015 05 2015 ADOPT IN-HOUSE MATERIAL GENERATION $38,230 $27,200 Not Implemented
CO0683 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,540 $21,440 Not Implemented
CO0683 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,750 $13,140 Not Implemented
CO0683 # 03 Y:2014 03 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,270 $0 Not Implemented
CO0683 # 04 Y:2014 04 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,440 $6,450 Not Implemented
CO0674 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,670 $310 Implemented
CO0674 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,510 $13,600 Not Implemented
CO0674 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $3,740 $0 Not Implemented
CO0674 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,320 $500 Not Implemented
CO0674 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $250 Implemented
DL0104 # 01 Y:2013 01 2013 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $31,000 $510 Not Implemented
DL0104 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,500 $780 Not Implemented
DL0104 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $39,500 $1,000 Not Implemented
DL0104 # 04 Y:2013 04 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,300 $100 Not Implemented