IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 334118 Computer Terminal and Other Computer Peripheral Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0047 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,278 $200 Not Implemented
BS0047 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,021 $495 Not Implemented
BS0047 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $32,541 Not Implemented
CO0674 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,320 $500 Not Implemented
CO0674 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $250 Implemented
CO0674 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,670 $310 Implemented
CO0674 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,510 $13,600 Not Implemented
CO0674 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $3,740 $0 Not Implemented
SU0324 # 08 Y:2012 08 2012 USE OTHER WASTE CONCENTRATION METHODS $5,924 $18,000 Not Implemented
SU0324 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,282 $6,008 Implemented
SU0324 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $426 $777 Not Implemented
SU0324 # 05 Y:2012 05 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,357 $5,371 Not Implemented
SU0324 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,908 $0 Implemented
SU0324 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,326 $0 Implemented
SU0324 # 03 Y:2012 03 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $952 $0 Implemented
SU0324 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $280 Implemented
OR0500 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $15,000 $4,800 Not Implemented
OR0500 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,400 $1,200 Not Implemented
OR0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $16,600 $10,100 Not Implemented
OR0500 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $51,600 $105,000 Not Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
AS0420 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $5,000 Implemented
AS0420 # 03 Y:2006 03 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,254 $3,300 Not Implemented