Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 334118 | Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0674 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,670 | $310 | Implemented |
CO0674 # 02 Y:2013 | 02 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $4,510 | $13,600 | Not Implemented |
CO0674 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $3,740 | $0 | Not Implemented |
CO0674 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,320 | $500 | Not Implemented |
CO0674 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,830 | $250 | Implemented |
SU0324 # 08 Y:2012 | 08 | 2012 | USE OTHER WASTE CONCENTRATION METHODS | $5,924 | $18,000 | Not Implemented |
SU0324 # 07 Y:2012 | 07 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,282 | $6,008 | Implemented |
SU0324 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $426 | $777 | Not Implemented |
SU0324 # 05 Y:2012 | 05 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,357 | $5,371 | Not Implemented |
SU0324 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $820 | $280 | Implemented |
SU0324 # 03 Y:2012 | 03 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $952 | $0 | Implemented |
SU0324 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,326 | $0 | Implemented |
SU0324 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,908 | $0 | Implemented |
OR0500 # 03 Y:2006 | 03 | 2006 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $39,400 | $42,000 | Implemented |
OR0500 # 07 Y:2006 | 07 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,400 | $1,200 | Not Implemented |
OR0500 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $15,000 | $4,800 | Not Implemented |
OR0500 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $16,600 | $10,100 | Not Implemented |
OR0500 # 04 Y:2006 | 04 | 2006 | MINIMIZE WATER USAGE | $51,600 | $105,000 | Not Implemented |
OR0500 # 02 Y:2006 | 02 | 2006 | INSTALL COMMON HEADER ON COMPRESSORS | $36,300 | $31,500 | Implemented |
OR0500 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,000 | $31,500 | Implemented |
AS0420 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $18,572 | Implemented |
AS0420 # 06 Y:2006 | 06 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $885 | $13,820 | Implemented |
AS0420 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,338 | $5,000 | Implemented |
AS0420 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,765 | $1,000 | Not Implemented |
AS0420 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,254 | $3,300 | Not Implemented |