IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
Reset
NAICS 3344 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0376 # 04 Y:2008 04 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,524 $8,800 Implemented
WV0376 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,611 $7,140 Implemented
WV0376 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,318 $0 Implemented
WV0376 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,345 $0 Implemented
WV0376 # 08 Y:2008 08 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,621 $425 Implemented
WV0376 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,750 $1,363 Implemented
WV0376 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $387 Implemented
WV0376 # 11 Y:2008 11 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,649 $0 Implemented
WV0376 # 12 Y:2008 12 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $984 $52 Not Implemented
WV0376 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $963 $1,431 Implemented
WV0376 # 14 Y:2008 14 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $196 Implemented
WV0376 # 15 Y:2008 15 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $484 $200 Implemented
UD0779 # 01 Y:2008 01 2008 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $255,168 $200,000 Not Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,679 $35,000 Not Implemented
UD0779 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $8,895 $412 Implemented
UD0779 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $5,482 $3,000 Not Implemented
UD0779 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,499 $9,173 Not Implemented
UD0779 # 11 Y:2008 11 2008 PAY BILLS ON TIME TO AVOID LATE FEES $4,322 $0 Implemented
UD0779 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,000 Implemented
UD0779 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $1,228 $100 Implemented