Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 3344 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0376 # 04 Y:2008 | 04 | 2008 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,524 | $8,800 | Implemented |
WV0376 # 05 Y:2008 | 05 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,611 | $7,140 | Implemented |
WV0376 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,318 | $0 | Implemented |
WV0376 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,345 | $0 | Implemented |
WV0376 # 08 Y:2008 | 08 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,621 | $425 | Implemented |
WV0376 # 09 Y:2008 | 09 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,750 | $1,363 | Implemented |
WV0376 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,750 | $387 | Implemented |
WV0376 # 11 Y:2008 | 11 | 2008 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,649 | $0 | Implemented |
WV0376 # 12 Y:2008 | 12 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $984 | $52 | Not Implemented |
WV0376 # 13 Y:2008 | 13 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $963 | $1,431 | Implemented |
WV0376 # 14 Y:2008 | 14 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $610 | $196 | Implemented |
WV0376 # 15 Y:2008 | 15 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $484 | $200 | Implemented |
UD0779 # 01 Y:2008 | 01 | 2008 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $255,168 | $200,000 | Not Implemented |
UD0779 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $95,648 | $1,000 | Implemented |
UD0779 # 03 Y:2008 | 03 | 2008 | REPLACE BOILER | $17,736 | $65,000 | Implemented |
UD0779 # 04 Y:2008 | 04 | 2008 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $13,555 | $500 | Implemented |
UD0779 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,503 | $3,318 | Implemented |
UD0779 # 06 Y:2008 | 06 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $75,942 | $100,000 | Implemented |
UD0779 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,679 | $35,000 | Not Implemented |
UD0779 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $8,895 | $412 | Implemented |
UD0779 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $5,482 | $3,000 | Not Implemented |
UD0779 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,499 | $9,173 | Not Implemented |
UD0779 # 11 Y:2008 | 11 | 2008 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,322 | $0 | Implemented |
UD0779 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,658 | $1,000 | Implemented |
UD0779 # 13 Y:2008 | 13 | 2008 | INSULATE BARE EQUIPMENT | $1,228 | $100 | Implemented |