Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,694
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0051 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,986 | $5,609 | n/a |
NT0051 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $586 | $0 | n/a |
NT0051 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $32,918 | $193,830 | n/a |
NT0051 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,814 | $0 | n/a |
NT0051 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,603 | $6,709 | n/a |
NT0051 # 01 Y:2025 | 01 | 2025 | REDUCE SCRAP PRODUCTION | $98,944 | $80,000 | n/a |
UC2509 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,936 | $100 | n/a |
UC2509 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,478 | $50 | n/a |
UC2509 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,692 | $9,100 | n/a |
UC2509 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,546 | $32,370 | n/a |
UC2509 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,237 | $0 | n/a |
UC2509 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $42,258 | $132,297 | n/a |
UC2509 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8,347 | $2,798 | n/a |
UC2509 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,269 | $1,190 | n/a |
UC2509 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $114 | $0 | n/a |
NT0048 # 07 Y:2025 | 07 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $321,458 | $5,000 | n/a |
NT0048 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $998 | $1,346 | n/a |
NT0048 # 06 Y:2025 | 06 | 2025 | OPTIMIZE PLANT POWER FACTOR | $7,122 | $25,622 | n/a |
NT0048 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,633 | $5,609 | n/a |
NT0048 # 04 Y:2025 | 04 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $13,913 | $73,500 | n/a |
NT0048 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,312 | $55,710 | n/a |
NT0048 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,298 | $0 | n/a |
WV0686 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $247 | $108 | n/a |
WV0686 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,920 | $1,550 | n/a |
WV0686 # 04 Y:2025 | 04 | 2025 | INSTALL SET-BACK TIMERS | $1,875 | $1,135 | n/a |