IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0715 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $133 $100 Not Implemented
MA0715 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $599 $600 Implemented
MA0715 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $738 $1,638 Implemented
MA0715 # 03 Y:2013 03 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $889 $200 Implemented
MA0715 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $1,256 $1,795 Implemented
MA0715 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $4,116 $500 Not Implemented
MAS028 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,781 $0 Not Implemented
MAS028 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,815 $4,000 Implemented
MAS028 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $22,269 $9,650 Not Implemented
MAS028 # 01 Y:2012 01 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,819 $31,800 Implemented
MAS028 # 05 Y:2012 05 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,762 $5,000 Implemented
MAS025 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $50,701 $22,000 Not Implemented
MAS025 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $11,105 $10,770 Not Implemented
MAS025 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,097 $0 Not Implemented
MAS025 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,622 $935 Not Implemented
MAS025 # 05 Y:2012 05 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,171 $4,300 Implemented
MA0627 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $948 $1,000 Implemented
MA0627 # 05 Y:2008 05 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,648 $4,300 Not Implemented
MA0627 # 04 Y:2008 04 2008 USE MINIMUM SAFE OVEN VENTILATION $6,674 $5,000 Not Implemented
MA0627 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $6,984 $8,550 Implemented
MA0627 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $8,813 $16,000 Implemented
MA0627 # 01 Y:2008 01 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,302 $35,000 Implemented
MA0613 # 04 Y:2007 04 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,408 $15,900 Not Implemented
MA0613 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,574 $53,250 Implemented
MA0613 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,346 $54,617 Implemented