IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
NAICS 334412 Bare Printed Circuit Board Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0410 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $20 Implemented
WV0410 # 11 Y:2010 11 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $440 Not Implemented
MS0352 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92,249 $34,416 Not Implemented
MS0352 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,626 $5,300 Not Implemented
MS0352 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,061 $389 Not Implemented
MS0352 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,750 $9,711 Not Implemented
MS0352 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $284 $393 Not Implemented
AM0563 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,000 $52,000 Not Implemented
AM0563 # 02 Y:2009 02 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,577 $3,720 Not Implemented
AM0563 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,075 $1,260 Implemented
AM0563 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,040 $1,134 Not Implemented
AM0563 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $885 $610 Not Implemented
UA0030 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,479 $0 Implemented
UA0030 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,368 $1,500 Implemented
UA0030 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,426 $3,200 Not Implemented
UA0030 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $60 $66 Not Implemented
UA0030 # 05 Y:2009 05 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $174 $0 Implemented
UA0030 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,168 $80,743 Implemented
UA0030 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,173 $14,708 Implemented
MA0613 # 01 Y:2007 01 2007 REDUCE VENTILATION AIR $22,488 $15,475 Implemented
MA0613 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,346 $54,617 Implemented
MA0613 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,574 $53,250 Implemented
MA0613 # 04 Y:2007 04 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,408 $15,900 Not Implemented
MA0613 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $507 $256 Implemented
CO0597 # 01 Y:2007 01 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,720 $19,200 Not Implemented