Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
319
matching recommendationsNAICS | 334418 | Printed Circuit Assembly (Electronic Assembly) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0562 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,470 | $266,289 | n/a |
SU0562 # 11 Y:2024 | 11 | 2024 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $437 | $2,900 | n/a |
SU0562 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $632 | n/a |
SU0562 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $639 | $2,272 | n/a |
SU0562 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,090 | $0 | n/a |
SU0562 # 01 Y:2024 | 01 | 2024 | DISCONNECT BALLASTS | $526 | $0 | n/a |
SU0562 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $75,000 | $86,000 | n/a |
SU0562 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $656 | $0 | n/a |
SU0562 # 08 Y:2024 | 08 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,000 | $80,000 | n/a |
SU0562 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $374 | $418 | n/a |
SU0562 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $291 | $1,234 | n/a |
SU0562 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,064 | $120 | n/a |
MU0056 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,248 | $158,400 | n/a |
MU0056 # 05 Y:2024 | 05 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $120 | $187 | n/a |
MU0056 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $601 | $1,181 | n/a |
MU0056 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8 | $0 | n/a |
MU0056 # 06 Y:2024 | 06 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,122 | $0 | n/a |
MU0056 # 04 Y:2024 | 04 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $502 | $207 | n/a |
MU0056 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $42,634 | $3,703 | n/a |
UC2411 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $572 | $2,608 | n/a |
UC2411 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,268 | $223,076 | n/a |
UC2411 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,065 | $75 | n/a |
UC2411 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $78 | $100 | n/a |
UC2411 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $962 | $0 | n/a |
UC2411 # 06 Y:2024 | 06 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,203 | $1,779 | n/a |