IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 334418 Printed Circuit Assembly (Electronic Assembly) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0569 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $86 n/a
AS0569 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $146 n/a
AS0569 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $5,151 n/a
AS0569 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,945 $490 n/a
AS0569 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $5,717 $3,715 n/a
AS0569 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,444 $7,395 n/a
AS0569 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,436 $18,656 n/a
AS0434 # 06 Y:2017 06 2017 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $461 $450 Not Implemented
AS0434 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $307 $60 Implemented
AS0434 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $60 Not Implemented
AS0434 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,250 $2,513 Not Implemented
AS0434 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,200 Not Implemented
AS0434 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $43,502 $4,394 Not Implemented
AS0434 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $68,034 $6,582 Not Implemented
AS0439 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $629 $650 Not Implemented
AS0439 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,146 $4,770 Not Implemented
AS0439 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $950 Implemented
AS0439 # 04 Y:2017 04 2017 MAINTAIN MACHINES TO REDUCE LEAKS $734 $545 Not Implemented
AS0390 # 01 Y:2004 01 2004 $11,500 $80 Implemented
AS0390 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $289 $450 Implemented
AS0390 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,263 $30 Implemented
AS0390 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,590 $230 Not Implemented
AS0390 # 05 Y:2004 05 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,779 $197 Implemented
AS0390 # 04 Y:2004 04 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,384 $15,950 Not Implemented
AS0390 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $23,750 Not Implemented