Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsNAICS | 334418 | Printed Circuit Assembly (Electronic Assembly) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0619 # 10 Y:2024 | 10 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $300,000 | $183,056 | n/a |
UF0619 # 09 Y:2024 | 09 | 2024 | AUTOMATE FINISHING PROCESS | $315,000 | $181,056 | n/a |
UF0619 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $705 | $1,252 | n/a |
UF0619 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,007 | $0 | n/a |
UF0619 # 06 Y:2024 | 06 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,257 | $5,940 | n/a |
UF0619 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,458 | $9,470 | n/a |
UF0619 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,989 | $36,000 | n/a |
UF0619 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,655 | $13,445 | n/a |
UF0619 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,318 | $25,440 | n/a |
UF0619 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,482 | $6,000 | n/a |
UF0510 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $1,757 | $0 | Not Implemented |
UF0510 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $908 | $689 | Implemented |
UF0510 # 06 Y:2017 | 06 | 2017 | INSTALL EQUIPMENT TO MOVE PRODUCT | $944,640 | $126,336 | Implemented |
UF0510 # 05 Y:2017 | 05 | 2017 | AUTOMATE FINISHING PROCESS | $84,346 | $5,030 | Implemented |
UF0510 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $1,142 | $225 | Not Implemented |
UF0510 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,528 | $419 | Implemented |
MI0294 # 06 Y:2016 | 06 | 2016 | CONDENSE OPERATION INTO ONE BUILDING | $5,648 | $1,360 | Not Implemented |
MI0294 # 14 Y:2016 | 14 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $502 | $1,624 | Not Implemented |
MI0294 # 07 Y:2016 | 07 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,081 | $4,200 | Implemented |
MI0294 # 08 Y:2016 | 08 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,830 | $40 | Implemented |
MI0294 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,176 | $7,505 | Not Implemented |
MI0294 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,797 | $40 | Implemented |
MI0294 # 16 Y:2016 | 16 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $342 | $375 | Implemented |
MI0294 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,218 | $12,637 | Not Implemented |
MI0294 # 17 Y:2016 | 17 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $124 | $340 | Not Implemented |