IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
NAICS 334419 Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0765 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Implemented
OK0765 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,974 $18,623 Implemented
OK0765 # 06 Y:2008 06 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $42,105 $161,000 Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $8,895 $412 Implemented
UD0779 # 11 Y:2008 11 2008 PAY BILLS ON TIME TO AVOID LATE FEES $4,322 $0 Implemented
UD0779 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,000 Implemented
UD0779 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $1,228 $100 Implemented
UD0779 # 14 Y:2008 14 2008 COVER OPEN TANKS $537 $360 Implemented
LM0119 # 06 Y:2006 06 2006 CONDENSE OPERATION INTO ONE BUILDING $3,375,000 $500,000 Implemented
NC0323 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87,704 $291,200 Implemented
NC0323 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,545 $10,648 Implemented
NC0323 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,783 $150 Implemented
UF0361 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,815 $9 Implemented
UF0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,264 $1 Implemented
UF0361 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,324 $2 Implemented
UF0361 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,002 $2 Implemented
UF0361 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,934 $0 Implemented
UF0357 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,460 $65,755 Implemented
UF0357 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $1,105 Implemented
UF0357 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,371 $1,560 Implemented