Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
427
matching recommendationsNAICS | 3345 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0572 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,321 | $1,387 | Implemented |
AS0572 # 04 Y:2024 | 04 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,801 | $1,399 | Implemented |
AS0572 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $258 | $79 | Implemented |
AS0572 # 01 Y:2024 | 01 | 2024 | INSTALL BACK-UP EQUIPMENT | $53,208 | $12,653 | Implemented |
TT0305 # 04 Y:2024 | 04 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $6,707 | $1,060 | Implemented |
TT0305 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,922 | $5,000 | Implemented |
UL2312 # 01 Y:2023 | 01 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,925 | $0 | Implemented |
UL2312 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $450 | $0 | Implemented |
TT0305 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $637 | $125 | Implemented |
UL2312 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,419 | $15,000 | Implemented |
UL2312 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $1,620 | Implemented |
TT0305 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $212 | $60 | Implemented |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | Implemented |
AM0890 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,790 | $18 | Implemented |
AM0890 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $240 | $480 | Implemented |
AM0890 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,090 | $1,000 | Implemented |
AM0890 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,660 | $2,690 | Implemented |
AS0558 # 10 Y:2023 | 10 | 2023 | MAINTAIN MACHINES TO REDUCE LEAKS | $94 | $181 | Implemented |
UF0593 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,641 | $136,253 | Implemented |
UF0593 # 09 Y:2023 | 09 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $36,476 | $11,225 | Implemented |
UF0593 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $62,208 | $25,500 | Implemented |
UF0593 # 08 Y:2023 | 08 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $121,588 | $12,000 | Implemented |
UF0593 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,604 | $0 | Implemented |
UF0593 # 01 Y:2023 | 01 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $131,807 | $215,600 | Implemented |
UF0593 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $110,377 | $92,132 | Implemented |