IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0387 # 04 Y:2009 04 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,000 $25,000 Not Implemented
NC0387 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $8,105 $7,000 Not Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
NC0387 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $2,019 $2,198 Not Implemented
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
NC0387 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $351 Not Implemented
CO0614 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,500 Implemented
CO0614 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,670 $1,000 Implemented
CO0614 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,010 $12,000 Implemented
CO0614 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $3,910 $84,000 Not Implemented
CO0613 # 01 Y:2008 01 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,040 $12,030 Not Implemented
CO0613 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,230 $3,000 Not Implemented
CO0613 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $3,000 Implemented
CO0613 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,060 $120 Not Implemented
CO0613 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,330 $9,130 Implemented
CO0613 # 06 Y:2008 06 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,300 $39,600 Not Implemented
CO0613 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,390 $1,000 Implemented
SD0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,517 $5,878 Implemented
SD0407 # 02 Y:2008 02 2008 AIR CONDITION ONLY SPACE NECESSARY $4,807 $0 Not Implemented
SD0407 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,196 $13,699 Implemented
SD0407 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,008 $7,140 Implemented
SD0407 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $1,374 Implemented
SD0407 # 06 Y:2008 06 2008 INSTALL SKYLIGHTS $990 $2,940 Not Implemented
IC0138 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,199 $66,929 Implemented
IC0138 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $537 Implemented