Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
398
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0261 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,895 | $7,860 | Implemented |
SU0261 # 08 Y:2007 | 08 | 2007 | REDUCE VENTILATION AIR | $12,057 | $13,919 | Implemented |
SU0261 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,800 | $5,887 | Implemented |
SU0261 # 11 Y:2007 | 11 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $40 | $153 | Implemented |
SU0261 # 12 Y:2007 | 12 | 2007 | INSTALL OCCUPANCY SENSORS | $368 | $1,801 | Implemented |
SU0261 # 13 Y:2007 | 13 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,169 | $135,500 | Implemented |
LE0234 # 01 Y:2006 | 01 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $190,924 | $500,000 | Implemented |
LE0234 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $46,545 | $3,000 | Implemented |
LE0234 # 05 Y:2006 | 05 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,090 | $6,000 | Implemented |
LE0234 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $5,320 | $1,500 | Implemented |
LE0234 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $3,490 | Implemented |
LE0234 # 08 Y:2006 | 08 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $593 | $60 | Implemented |
NC0334 # 02 Y:2006 | 02 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,870 | $1,000 | Implemented |
NC0334 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,466 | $500 | Implemented |
NC0334 # 04 Y:2006 | 04 | 2006 | RECOVER AND REUSE COOLING WATER | $1,680 | $620 | Implemented |
NC0334 # 05 Y:2006 | 05 | 2006 | REDUCE VENTILATION AIR | $10,892 | $4,000 | Implemented |
NC0334 # 06 Y:2006 | 06 | 2006 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,773 | $1,300 | Implemented |
NC0334 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,065 | $0 | Implemented |
NC0334 # 08 Y:2006 | 08 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,306 | $8,000 | Implemented |
NC0334 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $5,061 | $3,300 | Implemented |
NC0334 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,095 | $100 | Implemented |
AM0503 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $500 | Implemented |
AM0503 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,320 | $300 | Implemented |
AM0503 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $930 | $27 | Implemented |
MA0576 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,240 | $3,120 | Implemented |