Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
398
matching recommendationsNAICS | 33451 | Navigational, Measuring, Electromedical, and Control Instruments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0421 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $2,695 | $1,365 | Implemented |
MI0421 # 07 Y:2023 | 07 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,466 | $1,492 | Implemented |
MA0854 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,825 | $12,405 | Implemented |
MA0854 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $3,953 | $6,018 | Implemented |
MA0854 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,399 | $3,125 | Implemented |
UU0215 # 02 Y:2023 | 02 | 2023 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,878 | $48,510 | Implemented |
UU0215 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,565 | $1,563 | Implemented |
UU0215 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,212 | $5,850 | Implemented |
UU0215 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,368 | $27,177 | Implemented |
UU0215 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,775 | $52,882 | Implemented |
UU0215 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $228 | $1,725 | Implemented |
UU0215 # 07 Y:2023 | 07 | 2023 | REDESIGN PROCESS | $913 | $2,360 | Implemented |
UD1044 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $318 | $0 | Implemented |
DL0206 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,028 | $27,352 | Implemented |
DL0206 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,447 | $8,852 | Implemented |
DL0206 # 01 Y:2022 | 01 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $917 | $0 | Implemented |
DL0206 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,292 | $0 | Implemented |
OK1066 # 05 Y:2022 | 05 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,555 | $0 | Implemented |
OK1066 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,177 | $23,400 | Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0119 # 02 Y:2021 | 02 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,402 | $1,640 | Implemented |
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
UA0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,600 | $9,695 | Implemented |
UA0246 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $1,067 | Implemented |