IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1044 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $0 Not Implemented
UD1044 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $6,187 $750 Not Implemented
UD1044 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $318 $0 Implemented
UD1044 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $1,611 $900 Not Implemented
UD1044 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,125 $2,940 Not Implemented
UD1044 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,822 $0 Not Implemented
CW0119 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,804 $0 Implemented
CW0119 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,837 $1,000 Implemented
CW0119 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,741 $613 Not Implemented
CW0119 # 06 Y:2021 06 2021 IMPROVE LUBRICATION PRACTICES $21,048 $10,400 Not Implemented
CW0119 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,381 $6,000 Implemented
CW0119 # 02 Y:2021 02 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,402 $1,640 Implemented
CW0119 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,554 $0 Not Implemented
UD0951 # 06 Y:2016 06 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,332 $3,750 Implemented
UD0951 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $780 $750 Not Implemented
UD0951 # 03 Y:2016 03 2016 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $5,257 $700 Not Implemented
UD0951 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $3,278 $1,200 Not Implemented
UD0951 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $50 Not Implemented
UD0951 # 01 Y:2016 01 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,773 $0 Not Implemented
UD0942 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,012 $810 Not Implemented
UD0942 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $7,691 $28,200 Not Implemented
UD0942 # 08 Y:2016 08 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,368 $0 Not Implemented
UD0942 # 07 Y:2016 07 2016 REDUCE VENTILATION AIR $1,533 $0 Not Implemented
UD0942 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,967 $4,500 Not Implemented
UD0942 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,296 $50 Not Implemented