Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsNAICS | 334514 | Totalizing Fluid Meter and Counting Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0384 # 05 Y:2014 | 05 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $46,884 | $80,000 | Not Implemented |
LE0384 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,878 | $2,080 | Not Implemented |
LE0384 # 03 Y:2014 | 03 | 2014 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,284 | $1,010 | Not Implemented |
LE0384 # 02 Y:2014 | 02 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,272 | $1,481 | Implemented |
OK0876 # 08 Y:2014 | 08 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $41,800 | $54,000 | Not Implemented |
OK0876 # 07 Y:2014 | 07 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,400 | $30 | Not Implemented |
OK0876 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,040 | $645 | Not Implemented |
OK0876 # 05 Y:2014 | 05 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $168 | $15 | Not Implemented |
OK0876 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $870 | $830 | Not Implemented |
OK0876 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,306 | $530 | Not Implemented |
OK0876 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $1,600 | Not Implemented |
OK0876 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,084 | $3,640 | Not Implemented |
NC0475 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,801 | $48,075 | Not Implemented |
NC0475 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $9,597 | $5,600 | Not Implemented |
NC0475 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,988 | $4,750 | Not Implemented |
NC0475 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $975 | $1,124 | Not Implemented |
NC0475 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $100 | Not Implemented |
NC0475 # 06 Y:2013 | 06 | 2013 | REDUCE FLUID FLOW RATES | $16,217 | $25,000 | Not Implemented |
UA0063 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,417 | $1,000 | Implemented |
UA0063 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $35,465 | $27,200 | Implemented |
UA0063 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $524 | $202 | Not Implemented |
UA0063 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,363 | $3,900 | Implemented |
UA0063 # 04 Y:2011 | 04 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $28,528 | $3,584 | Implemented |
UA0063 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $17,580 | $100 | Not Implemented |
UA0063 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,938 | $1,003 | Implemented |