IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 334514 Totalizing Fluid Meter and Counting Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0384 # 05 Y:2014 05 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $46,884 $80,000 Not Implemented
LE0384 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,878 $2,080 Not Implemented
LE0384 # 03 Y:2014 03 2014 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,284 $1,010 Not Implemented
LE0384 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,272 $1,481 Implemented
OK0876 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,800 $54,000 Not Implemented
OK0876 # 07 Y:2014 07 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,400 $30 Not Implemented
OK0876 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,040 $645 Not Implemented
OK0876 # 05 Y:2014 05 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $168 $15 Not Implemented
OK0876 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $870 $830 Not Implemented
OK0876 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $530 Not Implemented
OK0876 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $681 $1,600 Not Implemented
OK0876 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,084 $3,640 Not Implemented
NC0475 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,801 $48,075 Not Implemented
NC0475 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $9,597 $5,600 Not Implemented
NC0475 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,988 $4,750 Not Implemented
NC0475 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,124 Not Implemented
NC0475 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $100 Not Implemented
NC0475 # 06 Y:2013 06 2013 REDUCE FLUID FLOW RATES $16,217 $25,000 Not Implemented
UA0063 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,417 $1,000 Implemented
UA0063 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $35,465 $27,200 Implemented
UA0063 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $524 $202 Not Implemented
UA0063 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,363 $3,900 Implemented
UA0063 # 04 Y:2011 04 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $28,528 $3,584 Implemented
UA0063 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,580 $100 Not Implemented
UA0063 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,938 $1,003 Implemented