IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0284 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,480 $3,669 Implemented
IC0284 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,864 $0 Implemented
IC0284 # 03 Y:2023 03 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $445 $0 Implemented
IC0284 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $556 $897 Implemented
IC0284 # 06 Y:2023 06 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $192,600 $121,203 Implemented
IC0284 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 Implemented
IC0284 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $379 Implemented
IC0241 # 03 Y:2020 03 2020 PAY BILLS ON TIME TO AVOID LATE FEES $5,410 $0 Implemented
IC0241 # 04 Y:2020 04 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $7,230 $0 Implemented
IC0241 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,157 $12,984 Implemented
IC0241 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $4,105 Implemented
IC0241 # 08 Y:2020 08 2020 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $128,857 $36,950 Implemented
IC0241 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,437 $2,557 Implemented
BD0462 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $9,937 $8,800 Implemented
BD0462 # 05 Y:2015 05 2015 REPLACE BOILER $3,962 $7,604 Implemented
BD0462 # 04 Y:2015 04 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,049 $4,000 Implemented
BD0462 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,604 $3,500 Implemented
BD0462 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $300 Implemented
BD0421 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $4,683 $4,200 Implemented
BD0421 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $700 Implemented
BD0421 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,364 $30,195 Implemented
BD0421 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,571 $15,000 Implemented
BD0421 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,067 $1,425 Implemented
BD0421 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,968 $1,500 Implemented
BD0321 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $32,663 $120,000 Implemented