IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0227 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $550 Not Implemented
TT0227 # 07 Y:2019 07 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $399 $750 Not Implemented
TT0131 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,347 $972 Not Implemented
TT0131 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,605 $30,150 Not Implemented
TT0131 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,715 $63,236 Implemented
TT0131 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,202 $16,590 Implemented
TT0131 # 05 Y:2014 05 2014 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,687 $8,925 Not Implemented
TT0131 # 06 Y:2014 06 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $206,605 $247,740 Not Implemented
TT0072 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $16,018 $0 Implemented
TT0071 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,100 $66,100 Implemented
TT0071 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,400 $52,100 Implemented
TT0071 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,100 $8,000 Not Implemented
TT0071 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $5 Implemented
TT0071 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,900 $5,000 Not Implemented
TT0071 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,600 $3,000 Not Implemented
TT0071 # 07 Y:2011 07 2011 UPGRADE CONTROLS ON COMPRESSORS $4,400 $9,000 Not Implemented
TT0052 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,444 $3,000 Implemented
TT0052 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,100 $7,000 Not Implemented
TT0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,000 $15,450 Not Implemented
TT0052 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $15,000 Not Implemented
TT0050 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,500 $2,900 Not Implemented
TT0050 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,479 $4,300 Implemented
TT0050 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $6,800 $1,000 Not Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented