IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,103

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0483 # 10 Y:2016 10 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $320 Not Implemented
BD0483 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $243 $600 Not Implemented
SU0409 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $802 $0 Not Implemented
SU0409 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $1,604 $822 Implemented
SU0409 # 03 Y:2016 03 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,899 $1,546 Implemented
SU0409 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $292 $233 Implemented
SU0409 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $160 Not Implemented
SU0409 # 06 Y:2016 06 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $36 $63 Implemented
SU0409 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $1,262 Implemented
CO0719 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,840 $3,490 Not Implemented
CO0719 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,060 $50,310 Not Implemented
CO0719 # 03 Y:2016 03 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,380 $48,350 Not Implemented
MZ0203 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,747 $680 Implemented
MZ0203 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $11,425 Implemented
MZ0203 # 03 Y:2016 03 2016 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $324 $1,975 Implemented
MZ0203 # 04 Y:2016 04 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,109 $37,500 Not Implemented
WM0079 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,526 $12,300 Not Implemented
WM0079 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $8,412 $2,365 Not Implemented
WM0079 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,351 $1,600 Not Implemented
WM0079 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,974 $150 Not Implemented
WM0079 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $1,470 Not Implemented
WM0079 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,982 $198 Not Implemented
WM0079 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,542 $320 Not Implemented
WM0079 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $624 $2,210 Not Implemented
WM0079 # 09 Y:2015 09 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $300 Not Implemented