IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0488 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,111 $1,500 Not Implemented
NC0488 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $323 $600 Implemented
NC0488 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,980 $19,622 Implemented
NC0488 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $496 $0 Not Implemented
OK0865 # 01 Y:2013 01 2013 INSTALL SET-BACK TIMERS $2,575 $1,530 Implemented
OK0865 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $47,613 $33,780 Implemented
OK0865 # 03 Y:2013 03 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,494 $1,776 Implemented
OK0865 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,200 $9,900 Not Implemented
OK0865 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $138 $1,771 Not Implemented
OK0865 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,091 $35,380 Not Implemented
OK0865 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,472 $1,050 Implemented
OK0865 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,177 $462 Implemented
OK0865 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $7,362 $1,220 Not Implemented
OK0865 # 10 Y:2013 10 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,044 $3,080 Not Implemented
OK0865 # 11 Y:2013 11 2013 OPTIMIZE PLANT POWER FACTOR $4,129 $11,222 Not Implemented
OR0604 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,634 $500 Implemented
OR0604 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $144,955 $110,000 Not Implemented
OR0604 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $53,512 $43,218 Not Implemented
OR0604 # 04 Y:2013 04 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,502 $5,712 Not Implemented
OR0604 # 05 Y:2013 05 2013 UPGRADE CONTROLS ON COMPRESSORS $11,228 $11,850 Implemented
MA0705 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,642 $200 Not Implemented
MA0705 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,284 $19,400 Implemented
MA0705 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,053 $2,800 Implemented
MA0705 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,037 $8,350 Not Implemented
MA0705 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $3,939 $13,700 Implemented