IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0489 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,606 $3,000 Not Implemented
WI0489 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $2,314 Implemented
WI0489 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $0 Implemented
WI0489 # 07 Y:2005 07 2005 IMPROVE LUBRICATION PRACTICES $735 $828 Not Implemented
WI0489 # 08 Y:2005 08 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $815 $0 Implemented
WI0489 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $481 $100 Implemented
WI0489 # 10 Y:2005 10 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $206 $0 Implemented
GT0799 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,890 $450 Not Implemented
GT0799 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,582 $3,682 Implemented
GT0799 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $280,000 Not Implemented
GT0799 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,608 $12,000 Not Implemented
GT0799 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $29,409 $260,000 Not Implemented
GT0799 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,500 $60,000 Implemented
GT0798 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,607 $4,928 Implemented
GT0798 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,418 $2,172 Implemented
GT0798 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,342 $990 Not Implemented
GT0798 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,633 $400 Not Implemented
GT0798 # 05 Y:2005 05 2005 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $14,902 $2,757 Not Implemented
GT0798 # 06 Y:2005 06 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,855 $0 Not Implemented
GT0798 # 07 Y:2005 07 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,739 $0 Implemented
AM0485 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,045 $660 Implemented
AM0485 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,290 $600 Implemented
AM0485 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $4,150 $11,235 Not Implemented
AM0485 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,130 $0 Implemented
AM0485 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $715 $0 Not Implemented