Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0330 # 04 Y:2005 | 04 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,049 | $35 | Implemented |
WV0330 # 03 Y:2005 | 03 | 2005 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,364 | $3,679 | Not Implemented |
WV0330 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $95 | Implemented |
WV0330 # 02 Y:2005 | 02 | 2005 | ADD AREA LIGHTING SWITCHES | $3,316 | $1,325 | Implemented |
WV0330 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $789 | $6 | Implemented |
WV0330 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $508 | $105 | Implemented |
WV0330 # 07 Y:2005 | 07 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $474 | $140 | Not Implemented |
WV0330 # 01 Y:2005 | 01 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,602 | $0 | Implemented |
CO0571 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $1,000 | Implemented |
CO0571 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,580 | $500 | Implemented |
CO0571 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,130 | $1,560 | Not Implemented |
CO0571 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,520 | $5,600 | Not Implemented |
CO0571 # 04 Y:2005 | 04 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,540 | $3,240 | Not Implemented |
CO0571 # 08 Y:2005 | 08 | 2005 | INSTALL SKYLIGHTS | $6,230 | $56,000 | Not Implemented |
CO0571 # 09 Y:2005 | 09 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $1,540 | $14,140 | Not Implemented |
CO0571 # 05 Y:2005 | 05 | 2005 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $770 | $3,000 | Not Implemented |
CO0571 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,660 | $37,360 | Not Implemented |
CO0571 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $9,920 | $6,000 | Not Implemented |
CO0574 # 01 Y:2005 | 01 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,120 | $6,000 | Not Implemented |
CO0574 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,350 | $12,520 | Not Implemented |
SU0218 # 14 Y:2005 | 14 | 2005 | OPTIMIZE PLANT POWER FACTOR | $18,968 | $61,178 | Implemented |
CO0574 # 06 Y:2005 | 06 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $450 | $110 | Not Implemented |
CO0574 # 11 Y:2005 | 11 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $840 | $6,120 | Not Implemented |
CO0574 # 10 Y:2005 | 10 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,830 | $6,160 | Not Implemented |
CO0574 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $162 | $118 | Implemented |