Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3353 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | Not Implemented |
TT0302 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,990 | $20,000 | Not Implemented |
TT0302 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,886 | $0 | Not Implemented |
TT0302 # 05 Y:2023 | 05 | 2023 | METER WASTE WATER | $18,930 | $1,100 | Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
TT0302 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,359 | $90,000 | Not Implemented |
TT0302 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,184 | $15,000 | Not Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
TT0227 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,110 | $550 | Not Implemented |
TT0227 # 07 Y:2019 | 07 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $399 | $750 | Not Implemented |
TT0227 # 05 Y:2019 | 05 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,646 | $2,000 | Implemented |
TT0227 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,227 | $2,000 | Implemented |
TT0227 # 03 Y:2019 | 03 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,828 | $5,000 | Implemented |
TT0227 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,143 | $2,500 | Not Implemented |
TT0227 # 01 Y:2019 | 01 | 2019 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $73,127 | $4,450 | Not Implemented |
TT0131 # 01 Y:2014 | 01 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,347 | $972 | Not Implemented |
TT0131 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,715 | $63,236 | Implemented |
TT0131 # 06 Y:2014 | 06 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $206,605 | $247,740 | Not Implemented |
TT0131 # 05 Y:2014 | 05 | 2014 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $3,687 | $8,925 | Not Implemented |
TT0131 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,605 | $30,150 | Not Implemented |
TT0131 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,202 | $16,590 | Implemented |
TT0072 # 01 Y:2011 | 01 | 2011 | USE OPTIMUM TEMPERATURE | $16,018 | $0 | Implemented |
TT0052 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,700 | $15,000 | Not Implemented |
TT0052 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,000 | $15,450 | Not Implemented |
TT0052 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,100 | $7,000 | Not Implemented |