IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 33531 Electrical Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0340 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $76,635 $17,000 n/a
TT0340 # 03 Y:2025 03 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $125,959 $10,087 n/a
TT0340 # 02 Y:2025 02 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $149,724 $887,569 n/a
TT0340 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,750 $25,000 n/a
TT0340 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,026 $16,500 n/a
TT0340 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $833 $700 n/a
TT0340 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,176 $200,000 n/a
TT0340 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,393 $211,862 n/a
TT0340 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $194,175 $1,500 n/a
TT0302 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,184 $15,000 Not Implemented
TT0302 # 08 Y:2023 08 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,956 $965 Not Implemented
TT0302 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,990 $20,000 Not Implemented
TT0302 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,886 $0 Not Implemented
TT0302 # 05 Y:2023 05 2023 METER WASTE WATER $18,930 $1,100 Implemented
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 Implemented
TT0302 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,359 $90,000 Not Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 Implemented
TT0227 # 07 Y:2019 07 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $399 $750 Not Implemented
TT0227 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $550 Not Implemented
TT0227 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $2,646 $2,000 Implemented
TT0227 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,227 $2,000 Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
TT0227 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,143 $2,500 Not Implemented
TT0227 # 01 Y:2019 01 2019 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $73,127 $4,450 Not Implemented
TT0131 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,347 $972 Not Implemented