Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
189
matching recommendationsNAICS | 335311 | Power, Distribution, and Specialty Transformer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0454 # 07 Y:2014 | 07 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $28,103 | $27,500 | Not Implemented |
TT0099 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,046 | $1,000 | Implemented |
TT0099 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,777 | $980 | Implemented |
TT0099 # 03 Y:2012 | 03 | 2012 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $9,303 | $10,800 | Implemented |
MZ0094 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,057 | $1,160 | Implemented |
MZ0094 # 02 Y:2012 | 02 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,672 | $3,000 | Not Implemented |
MZ0094 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,711 | $27,900 | Implemented |
MZ0094 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $621 | $0 | Implemented |
MZ0094 # 05 Y:2012 | 05 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,785 | $30,700 | Implemented |
MZ0094 # 06 Y:2012 | 06 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $12,505 | $14,400 | Not Implemented |
MZ0094 # 07 Y:2012 | 07 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,836 | $900 | Implemented |
TT0072 # 01 Y:2011 | 01 | 2011 | USE OPTIMUM TEMPERATURE | $16,018 | $0 | Implemented |
NC0418 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $244,640 | $566,702 | Not Implemented |
NC0418 # 02 Y:2011 | 02 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,535 | $5,000 | Implemented |
NC0418 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,540 | $37,837 | Not Implemented |
NC0418 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $202 | $600 | Not Implemented |
NC0418 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,663 | $100 | Implemented |
NC0418 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $133 | $567 | Not Implemented |
NC0418 # 07 Y:2011 | 07 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,969 | $25,000 | Not Implemented |
TT0052 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,444 | $3,000 | Implemented |
TT0052 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,100 | $7,000 | Not Implemented |
TT0052 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,000 | $15,450 | Not Implemented |
TT0052 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,700 | $15,000 | Not Implemented |
WV0419 # 01 Y:2010 | 01 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $80,000 | $53,870 | Not Implemented |
WV0419 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $66,262 | $161,162 | Implemented |