IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 335313 Switchgear and Switchboard Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0213 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,940 $1,100 Implemented
MZ0100 # 01 Y:2012 01 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $10,313 $2,550 Implemented
MZ0100 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $32,458 $30,000 Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
GT0887 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,716 $2,500 Implemented
NC0385 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $362 $499 Implemented
NC0385 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,357 $500 Implemented
NC0385 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
NC0385 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $9,880 Implemented
NC0385 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $1,643 Implemented
NC0385 # 07 Y:2009 07 2009 USE PHOTOCELL CONTROLS $213 $200 Implemented
IC0149 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $849 $0 Implemented
IC0149 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,460 $9,635 Implemented
IC0149 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,470 $7,381 Implemented
IC0149 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,526 $2,040 Implemented
IC0149 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
IC0149 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,594 $1,610 Implemented
IC0149 # 07 Y:2008 07 2008 UPGRADE OBSOLETE EQUIPMENT $19,706 $210 Implemented
IC0149 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $37,783 $29,280 Implemented
IC0149 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,263 $0 Implemented
GT0856 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,329 $80,207 Implemented
GT0856 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,097 $4,500 Implemented
GT0856 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,290 $2,000 Implemented