IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 335314 Relay and Industrial Control Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2306 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $375 $0 Implemented
UC2306 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $11,635 Implemented
UC2306 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,153 $34,274 Implemented
WM0140 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,984 $27,284 Implemented
WM0140 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,092 $0 Implemented
WM0140 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,432 $51,563 Implemented
MZ0245 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,450 $2,183 Implemented
MZ0245 # 11 Y:2017 11 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,076 $250 Implemented
MZ0245 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,959 $47,658 Implemented
MZ0245 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,755 $150 Implemented
MZ0245 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,202 $500 Implemented
MZ0245 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,321 $1,300 Implemented
MZ0245 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,089 $2,730 Implemented
AM0729 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $580 $220 Implemented
AM0729 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,930 $1,000 Implemented
AM0729 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $3,490 $3,740 Implemented
AM0729 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,965 $28,840 Implemented
AM0729 # 01 Y:2017 01 2017 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $6,900 $0 Implemented
SU0418 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $336 $333 Implemented
SU0418 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $641 $0 Implemented
SU0390 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,702 $1,033 Implemented
SU0390 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $355 $0 Implemented
MZ0162 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $537 $2,680 Implemented
MZ0162 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,287 $16,804 Implemented
UK1315 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,528 $0 Implemented