IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
NAICS 33599 All Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0361 # 08 Y:2007 08 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $657 $276 Implemented
OK0736 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $224,746 $154,440 Implemented
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
SU0232 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,030 $0 Implemented
SU0232 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,876 $0 Implemented
SU0232 # 03 Y:2006 03 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,612 $0 Implemented
SU0232 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $890 $0 Implemented
SU0232 # 05 Y:2006 05 2006 $773 $0 Implemented
SU0232 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $583 Implemented
SU0232 # 08 Y:2006 08 2006 KEEP BOILER TUBES CLEAN $2,880 $1,534 Implemented
SU0218 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,117 $2,100 Implemented
SU0218 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,729 $1,878 Implemented
SU0218 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,220 $53,200 Implemented
SU0218 # 14 Y:2005 14 2005 OPTIMIZE PLANT POWER FACTOR $18,968 $61,178 Implemented
WI0489 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $8,655 $1,600 Implemented
WI0489 # 02 Y:2005 02 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,360 $0 Implemented
WI0489 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,677 $758 Implemented
WI0489 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,494 $2,314 Implemented
WI0489 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $782 $0 Implemented
WI0489 # 08 Y:2005 08 2005 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $815 $0 Implemented