IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
Reset
NAICS 33599 All Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0130 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,562 $17,397 n/a
CW0130 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,298 $8,391 n/a
SJ0012 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,778 $22,286 Implemented
SJ0012 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $151,265 $402,860 Not Implemented
SJ0012 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $0 Not Implemented
SJ0012 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26 $0 Not Implemented
SJ0012 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 Not Implemented
SJ0012 # 06 Y:2024 06 2024 USE MINIMUM SAFE OVEN VENTILATION $157 $217 Not Implemented
SJ0012 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,511 $11,438 Not Implemented
NT0019 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $60,556 $294,320 Not Implemented
NT0019 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,486 $33,471 Not Implemented
NT0019 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,036 $9,814 Not Implemented
NT0019 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $12,574 $0 Not Implemented
NT0019 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,487 $4,553 Not Implemented
SU0532 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $827 $580 Implemented
SU0532 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24 $100 Implemented
SU0532 # 08 Y:2023 08 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,165 $0 Not Implemented
SU0532 # 02 Y:2023 02 2023 PAY BILLS ON TIME TO AVOID LATE FEES $1,177 $0 Implemented
SU0532 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,953 $8,568 Implemented
SU0532 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,803 $0 Implemented
SU0532 # 10 Y:2023 10 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $0 Not Implemented
SU0532 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,119 $2,000 Implemented
SU0532 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,864 $0 Not Implemented
SU0532 # 01 Y:2023 01 2023 DISCONNECT BALLASTS $6,186 $0 Not Implemented
WV0645 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $182 $646 Implemented