IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,773

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0339 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,664 $994 Not Implemented
SU0339 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,064 $125 Implemented
SU0339 # 04 Y:2013 04 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $18,079 $3,600 Implemented
SU0339 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $429 $152 Implemented
SU0339 # 06 Y:2013 06 2013 REDUCE VENTILATION AIR $1,471 $882 Not Implemented
SU0339 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,294 $2,093 Implemented
SU0339 # 08 Y:2013 08 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $35,885 $54,000 Not Implemented
SU0339 # 09 Y:2013 09 2013 ELIMINATE/REDUCE AN OPERATION $13,535 $19,680 Implemented
SU0339 # 10 Y:2013 10 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $716 $1,567 Not Implemented
SU0339 # 11 Y:2013 11 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,108 $20,639 Not Implemented
SU0339 # 12 Y:2013 12 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $381 $1,312 Not Implemented
OK0846 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,618 $31,000 Not Implemented
OK0846 # 04 Y:2013 04 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,018 $8,775 Not Implemented
OK0846 # 05 Y:2013 05 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,467 $13,650 Implemented
OK0846 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,061 $3,840 Implemented
OK0846 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $32,267 $17,174 Implemented
OK0846 # 08 Y:2013 08 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,202 $862 Implemented
OK0846 # 09 Y:2013 09 2013 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $493 $413 Implemented
OK0846 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,801 $9,541 Not Implemented
OK0846 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,561 $525 Implemented
OK0843 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,582 $3,116 Implemented
OK0843 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,466 $0 Implemented
OK0843 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,402 $1,000 Implemented
OK0843 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $950 $1,309 Not Implemented
OK0843 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $413 $875 Not Implemented