IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

777

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0906 # 05 Y:2014 05 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,162 $10,000 Not Implemented
UD0906 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,456 $5,614 Implemented
UD0906 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,000 Implemented
UD0906 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $618 $0 Not Implemented
UD0906 # 09 Y:2014 09 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $58,357 $14,000 Not Implemented
WV0490 # 01 Y:2014 01 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $10,882 $5,000 Implemented
WV0490 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,883 $16,722 Implemented
WV0490 # 03 Y:2014 03 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,124 $1,000 Not Implemented
WV0490 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,449 $364 Implemented
WV0490 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,052 $10,000 Implemented
WV0490 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,812 $500 Implemented
WV0490 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,569 $3,905 Implemented
WV0490 # 08 Y:2014 08 2014 REPLACE BOILER $1,367 $5,170 Implemented
WV0490 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $701 $1,075 Not Implemented
WV0490 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $381 $51 Not Implemented
UD0904 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,181 $0 Implemented
UD0904 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,875 $0 Implemented
UD0904 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $3,359 $450 Implemented
UD0904 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,024 $5,000 Implemented
UD0904 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $33,689 $62,131 Not Implemented
UD0904 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,892 $0 Implemented
UD0904 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $777 $384 Not Implemented
UD0904 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,236 $75,700 Implemented
UD0904 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,039 $0 Not Implemented
UD0904 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $16,866 $20,982 Implemented