IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2305 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,322 $500 Implemented
UL2305 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,779 $0 Implemented
UL2305 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $29,120 $60,633 Not Implemented
UL2305 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,738 $0 Implemented
UL2305 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,439 $0 Not Implemented
UL2305 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,763 $9,750 Not Implemented
UL2305 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $3,238 $9,672 Not Implemented
UL2302 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $854 $975 Not Implemented
UL2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $335 Not Implemented
UL2302 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,130 $820,000 Not Implemented
UL2302 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $30,686 $20,580 Not Implemented
UL2302 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,052 $8,500 Not Implemented
UL2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $149 $754 Not Implemented
UL2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,425 $0 Not Implemented
UL2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $960 Not Implemented
UL2216 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,227 $10,882 Implemented
UL2216 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,446 $39,000 Not Implemented
UL2216 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $960 Implemented
UL2216 # 11 Y:2022 11 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,497 $40,000 Not Implemented
UL2216 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $67,103 $45,461 Implemented
UL2216 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,561 $1,213,600 Not Implemented
UL2216 # 10 Y:2022 10 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,758 $500 Not Implemented
UL2216 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,523 $1,418,559 Not Implemented
UL2216 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,028 $0 Implemented
UL2216 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,196 $2,730 Implemented