Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
298
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0321 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,594 | $2,250 | n/a |
TT0321 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,097 | $10,000 | n/a |
TT0321 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,473 | $10,000 | n/a |
TT0321 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $71,296 | $345,600 | n/a |
TT0320 # 09 Y:2025 | 09 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,140 | $26,000 | n/a |
TT0320 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,445 | $1,710 | n/a |
TT0320 # 05 Y:2025 | 05 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,052 | $7,500 | n/a |
TT0320 # 01 Y:2025 | 01 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $30,976 | $12,000 | n/a |
TT0320 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,037 | $75,000 | n/a |
TT0320 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,337 | $238,118 | n/a |
TT0320 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,949 | $23,783 | n/a |
TT0320 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,320 | $15,000 | n/a |
TT0320 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,087 | $6,080 | n/a |
TT0292 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,223 | $4,750 | Implemented |
TT0292 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,900 | $600 | Not Implemented |
TT0292 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,057 | $2,190 | Implemented |
TT0292 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,004 | $4,240 | Not Implemented |
TT0292 # 03 Y:2023 | 03 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $8,884 | $18,000 | Implemented |
TT0292 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,268 | $50 | Implemented |
TT0292 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,314 | $15,941 | Implemented |
TT0292 # 01 Y:2023 | 01 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $28,974 | $250 | Not Implemented |
TT0284 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,705 | $50,300 | Not Implemented |
TT0284 # 02 Y:2023 | 02 | 2023 | MINIMIZE WATER USAGE | $10,675 | $240 | Implemented |
TT0284 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,266 | $3,750 | Not Implemented |
TT0284 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,764 | $13,000 | Implemented |