IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0028 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,570 $2,000 Not Implemented
TT0028 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $5,033 $23,900 Not Implemented
DL0026 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $38,000 $0 Implemented
DL0026 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,500 $0 Implemented
DL0026 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,841 $1,430 Not Implemented
DL0026 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $9,470 $0 Not Implemented
DL0026 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,327 $640 Not Implemented
DL0026 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,600 $2,800 Not Implemented
DL0026 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,000 $40,000 Implemented
DL0026 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,377 $45,000 Implemented
UM0342 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,661 $7,350 Not Implemented
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented
UM0342 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $515 Not Implemented
UM0342 # 06 Y:2008 06 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,437 $0 Not Implemented
UM0342 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $638 Implemented
IC0146 # 01 Y:2008 01 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,678 $1,537 Not Implemented
IC0146 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,159 $0 Implemented
IC0146 # 03 Y:2008 03 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $24,543 $208,785 Implemented
IC0146 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,453 $0 Not Implemented
IC0146 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $0 Not Implemented
IC0146 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $729 Implemented
IC0146 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $211 Implemented
IC0146 # 08 Y:2008 08 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $541 $0 Implemented