Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0731 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,083 | $68,849 | Implemented |
NC0338 # 01 Y:2006 | 01 | 2006 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $63,286 | $175,000 | Implemented |
NC0338 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $54,759 | $18,800 | Not Implemented |
NC0338 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,391 | $2,500 | Implemented |
NC0338 # 04 Y:2006 | 04 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,374 | $75,000 | Implemented |
NC0338 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,416 | $16,843 | Implemented |
NC0338 # 06 Y:2006 | 06 | 2006 | COVER OPEN TANKS | $1,097 | $1,600 | Implemented |
TA0116 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,371 | $16,650 | Not Implemented |
TA0116 # 02 Y:2006 | 02 | 2006 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,000 | $0 | Not Implemented |
TA0116 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $240 | Not Implemented |
TA0116 # 04 Y:2006 | 04 | 2006 | INSTALL SYSTEM TO COLLECT SCRAP | $21,734 | $1,600 | Not Implemented |
TA0116 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,820 | $0 | Not Implemented |
UM0299 # 01 Y:2006 | 01 | 2006 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $36,291 | $720 | Implemented |
UM0299 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,496 | $8,700 | Implemented |
UM0299 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,108 | $9,353 | Implemented |
UM0299 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,706 | $738 | Implemented |
UM0299 # 05 Y:2006 | 05 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,156 | $25 | Implemented |
UM0299 # 06 Y:2006 | 06 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,389 | $2,750 | Not Implemented |
UM0299 # 07 Y:2006 | 07 | 2006 | INSTALL SKYLIGHTS | $208 | $184 | Implemented |
IC0116 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,603 | $6,000 | Implemented |
IC0116 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,321 | $1,100 | Implemented |
IC0116 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $294 | $0 | Not Implemented |
IC0116 # 04 Y:2006 | 04 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $15,127 | $218 | Implemented |
IC0116 # 05 Y:2006 | 05 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,114 | $0 | Implemented |
IC0116 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $325 | $274 | Not Implemented |