Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0579 # 04 Y:2005 | 04 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,893 | $4,197 | Implemented |
MA0579 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,427 | $7,389 | Implemented |
MA0579 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,484 | $450 | Implemented |
MA0579 # 07 Y:2005 | 07 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,309 | $9,650 | Not Implemented |
MA0579 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $647 | $1,170 | Implemented |
MA0579 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,755 | $64,891 | Not Implemented |
MS0276 # 01 Y:2005 | 01 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $64,043 | $8,505 | Not Implemented |
MS0276 # 02 Y:2005 | 02 | 2005 | INSTALL OCCUPANCY SENSORS | $32,940 | $298 | Not Implemented |
MS0276 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,566 | $20,159 | Implemented |
MS0276 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,492 | $8,838 | Not Implemented |
MS0276 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,547 | $15,656 | Not Implemented |
MS0276 # 06 Y:2005 | 06 | 2005 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,712 | $1,848 | Not Implemented |
MS0276 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,158 | $1,871 | Implemented |
MS0276 # 08 Y:2005 | 08 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $398 | $478 | Not Implemented |
MA0578 # 01 Y:2005 | 01 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $86,353 | $20,000 | Implemented |
MA0578 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $13,684 | $4,800 | Not Implemented |
MA0578 # 03 Y:2005 | 03 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,767 | $25,000 | Implemented |
MA0578 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $318 | $327 | Not Implemented |
MA0578 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,718 | $5,475 | Implemented |
MA0578 # 06 Y:2005 | 06 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $36,304 | $600 | Implemented |
MA0578 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $54,679 | $800 | Not Implemented |
UM0281 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,337 | $300 | Implemented |
UM0281 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,591 | $3,891 | Implemented |
UM0281 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,961 | $75 | Implemented |
UM0281 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,214 | $75 | Implemented |